Labour versus materials

Where the labour actually goes in a painting job.

Most people assume the paint is the expensive part. On a properly executed job it usually is not — the labour, and specifically the preparation labour, is where the time and money go.

Reviewed 6 September 2026.

Paint samples, measured plans and neatly arranged project notes

At a glance

How much of a painting quotation is labour?

It varies with the condition of the surfaces, but on a job needing real preparation the labour typically outweighs the materials. Crack repair, putty, sanding and priming are almost entirely labour, and they take far longer than applying the finish coats that follow.

Measured in time, not in coats

The visible work — rolling on the finish — is the fastest stage. Assessment, masking, repair, levelling, sanding, priming and daily cleanup take the bulk of the hours on site, which is why two quotations with the same material spec can differ so much.

In order of impact

What moves the number.

Listed largest first. If a quotation is silent on the ones near the top, that silence is itself the answer.

  1. Preparation depth

    By far the largest labour item, and the one that decides how long the finish lasts.

  2. Cutting-in and detail

    Edges, corners, cornices and cutting around joinery are slow, skilled work that cannot be rushed.

  3. Protection and daily reinstatement

    In an occupied home this happens every day, not once.

  4. Access and working height

    Time spent moving and setting equipment is time not spent painting.

  5. Restricted working hours

    A shorter permitted day means more days for the same work.

  6. Supervision

    A supervisor on site is a real cost and the reason the work is consistent.

Method

How we build the quotation.

There are no figures here because none has been approved for publication. What follows is the sequence, so you can check anyone's quotation against it.

  1. Surfaces assessed and the preparation each needs recorded.
  2. Labour estimated by stage — protection, repair, levelling, sanding, priming, coats.
  3. Detail and cutting-in allowed for separately from open wall area.
  4. Daily protection and cleanup included where the property is occupied.
  5. Supervision included rather than assumed.
  6. The result itemised, so you can see labour and materials distinctly.

Painting Labour Cost Guide — your questions.

Why is your quotation higher than a painter quoting directly?

Usually because of what is inside it: assessed preparation, named products and coat counts, protection, supervision, cleanup, a written scope and warranty conditions. Compare the scopes rather than the totals and the difference normally explains itself.

Can I supply the paint myself to save money?

You can, and some customers do. Be aware that it changes where responsibility sits if the material turns out to be unsuitable for the surface, and we will say so in writing before starting.

Does more expensive paint reduce the labour?

No. Product grade affects durability and finish, not how long the wall takes to prepare. Spending more on paint over poor preparation is the least effective way to allocate a painting budget.

A measured quotation costs nothing.

We measure the property, assess the surfaces and issue an itemised quotation you can hold us to. There is no charge and no obligation.

  1. We call you back the same day to get a picture of the property and the surfaces.
  2. We agree a time and come out for the free inspection.
  3. You get the written scope and itemised quotation.
  4. Nothing starts until you approve it.