Classroom blocks handed back clean, aired and ready to use.

Classroom blocks, corridors, hostels and compound walls repainted block by block around your vacation calendar, so a block is only handed back once it has been finished, cleared and aired. Materials, dust and debris handled to suit a working campus.

  • Free site inspection
  • Written, itemised quote
  • 1-year workmanship warranty
  • Same-day callback
Protected commercial interior prepared for a professional repaint

At a glance

When can a school be painted without disrupting classes?

Almost always in the vacation window. Smaller jobs can often fit the Dasara or year-end breaks; a full campus usually needs the longer April to May gap, and at the survey we'll tell you honestly whether the scope in front of us fits the window you actually have. Most of the job is sequencing: which blocks are free, which still have exams or camps running, and what has to be finished, cleared and aired before that room takes students again.

When this is the answer, and when it is not.

Sending you to the wrong service wastes your money and our time. This is how to tell.

This is likely right if

  • You've a vacation window and want teaching blocks, corridors and stairwells done as one planned sequence
  • Corridor and classroom walls are marked to hand height and no longer clean down
  • Exterior cement paint is chalking and coming off on hands and uniforms
  • Years of patch repainting by different contractors have left the campus in mismatched colours

Something else comes first if

  • Classroom ceilings patch up again every monsoon, the terrace, chajja or parapet junction has to be traced and treated first, or the new coat lifts with the old one
  • Toilet block plaster is hollow and blistering with salt, that's leak repair and replastering before it is a painting job
  • The block is still holding board exams, admissions or a summer camp, those dates have to clear before rooms can be emptied and prepared properly

What the service includes.

  • Campus survey and condition report

    We walk every block with your facilities in-charge, classrooms, corridors, stairwell voids, toilet blocks, hall, hostel and compound wall, and record what each surface actually needs. Chalking cement paint, hollow plaster and damp patches are listed separately, because they change both the work and the order it happens in.

  • Vacation programme, block by block

    A written area plan agreed before we start: which block is taken up when, which stays open, and what must be finished, cleared and aired before that room is used again. Exam halls, admission offices and occupied hostel wings are worked around, not through.

  • Stripping and levelling

    Loose distemper and chalking cement paint scraped and washed back to a sound surface, cracks opened and filled, putty where the wall needs levelling. Pinboard holes, tape residue and years of chart marks along corridors are dealt with here rather than hidden under a coat.

  • Protection, material control and daily clearance

    Benches, boards, lab fittings and fans covered; switches, sockets, name plates and room signage masked. Paint, thinner and tools stay in one locked store and are never left standing in a classroom or corridor, and debris leaves the campus instead of sitting in a corner over the weekend.

  • Finish coats to a use-based specification

    Corridors and dado bands at hand height in a washable finish that stands up to daily cleaning, upper walls and ceilings in emulsion, toilet blocks specified for moisture. Coat counts and paint grades are written into the quotation area by area, not decided on site.

  • Grilles, railings, gates and steelwork

    Window grilles, staircase railings, corridor balustrades, MS doors and the main gate scraped back, rust treated and recoated. Old enamel on campus steelwork is scraped or wet-sanded and the residue bagged, rather than dry-sanded loose where children will be back.

Not included, or quoted separately

  • Terrace, chajja and parapet waterproofing, and tracing the source of ceiling or wall seepage, quoted separately
  • Blackboard and greenboard resurfacing, notice board fabric, signage fabrication and mural artwork
  • Sports court line marking, playground equipment refurbishment and floor coatings in labs or corridors
  • Electrical, plumbing and carpentry work, including refixing boards, fans or fittings that have to come off the wall
  • Structural crack investigation, or any work needing a structural engineer's opinion

The sequence.

  1. Campus walk and measurement

    We measure block by block and record the condition of each surface, classroom walls, corridor dado, ceilings, stairwells, toilet blocks, steelwork and compound wall. The quotation is built from that and broken down by block, so you can see what each part of the campus carries.

  2. Programme built around your calendar

    We take your vacation dates, exam dates, admission activity and camp bookings, then agree which block is taken up when. The sequence is written down before work starts, naming what's finished and handed back before each block reopens.

  3. Access and site arrangements

    Worker details submitted to your office, a single access route and locked material store agreed, scaffolding erected for hall ceilings and stairwell voids, and the working block screened off from any part of the campus still in use.

  4. Prepare the surface

    Stripping loose coatings, opening and filling cracks, putty where the wall needs levelling, sanding, and priming to suit what's underneath. Paint bonds to the layer below it, where that layer is chalky or damp, the new coat comes away with it, usually within one monsoon.

  5. Coat and check block by block

    Coats applied to the agreed specification, edges cut in by hand around boards, ducting and signage, and the block inspected while the scaffolding is still standing rather than after it comes down.

  6. Handover and record

    Each block walked with your facilities in-charge, touch-ups closed, furniture and boards put back, room cleaned and aired. At the end you get a record of what was applied where, and a written warranty with its conditions stated in it.

What moves the price on this job.

We do not publish a rate, because it would change once someone measured your property. These are the variables that decide it.

  • Measured wall, ceiling and steelwork area across the blocks in scope, not the built-up area of the campus
  • How much chalking cement paint or old distemper has to be stripped before anything can be applied
  • Access height, assembly hall ceilings, stairwell voids and upper-floor exteriors need scaffolding rather than ladders
  • How tight the vacation window is, and whether the sequence needs more hands working in parallel
  • Where a washable or moisture-tolerant finish is specified, against plain classroom walls
  • Condition of grilles, railings and gates, and how much rust removal the steelwork needs
Read the full cost guide

School and Institution Painting — your questions.

Can any of this be done while the school is running?

Limited work, yes, a compound wall, an exterior elevation away from classrooms, or a single block that can be sealed off and entered from outside. Full classroom and corridor painting during term doesn't work: the room has to be emptied, prepared, coated and aired, and children can't be moved in and out of that sequence around a teaching timetable.

What about paint smell and dust when children come back?

In any block being reoccupied soon after, we specify water-based, low-odour systems and keep solvent-based enamel out of classrooms. Sanding is done wet or with the debris contained, and residue is bagged and taken off site, old enamel on grilles and railings should never be dry-sanded loose on a campus. Rooms are cleaned and aired before we hand them back.

The same ceiling patches come back every monsoon. Will repainting fix them?

No. A patch that returns in the same place each June is water arriving from somewhere, a terrace that has lost its slope, a cracked parapet junction, a failed chajja drip, or a leaking overhead tank or pipe run. Coating over it traps the moisture and the new paint lifts with the old. The source has to be treated first, ideally in the same vacation so the block is disturbed once.

Can the whole campus be finished in one vacation?

Sometimes, depending on measured area, how much old coating has to come off, and how much of the campus is genuinely free. Where it doesn't fit, we say so at the survey and split it, teaching block interiors in one break, exteriors and hostel in the next. We would rather phase the work than compress preparation, because preparation decides how the finish holds up.

Do you provide details of the people working on campus?

Yes, and most institutions ask for it. Your office gets a list of the workers who will be on site with their identity details before we start, they stay within the block allotted for that day, and materials remain in one locked store. If your management has its own gate pass or verification procedure, we work to that instead.

Let us look at your walls first.

Tell us about the property and we will set up a free colour and wall inspection. You get a written, itemised quotation afterwards, with no obligation to go ahead.

  1. We call you back the same day to get a picture of the property and the surfaces.
  2. We agree a time and come out for the free inspection.
  3. You get the written scope and itemised quotation.
  4. Nothing starts until you approve it.